01
Service focus
Within a fuel-station project,Automatic tank gauging is a critical facility system performing a defined storage, transfer, measurement, control or protection duty. Its design must balance process performance, hazardous-area compliance, reliability, maintainability and life-cycle cost. Simei Energy starts from product data and operating scenarios to establish system capacity, equipment architecture, control boundaries and multidisciplinary interfaces.
02
Engineering delivery
Real operator journeys are reflected in the design, with attention to traffic, maintenance access, isolation and emergency accessibility. Engineering covers design cases, sizing or hydraulics, materials and equipment selection, data sheets, specifications, arrangement and interface checks, manufacturing inspection, installation quality and functional testing. Failure modes, standby philosophy, alarms, interlocks, isolation, disposal and access are reviewed. Power, grounding, area classification, signals and control logic are coordinated, and validation proceeds from individual equipment through subsystem to integrated operation.
03
Deliverables and project value
The owner receives traceable equipment records, inspection and test evidence, as-built information, operating requirements and recommended spares. Structured design and verification reduce leakage, operating error, measurement deviation and unplanned shutdown. Standard interfaces also support local replacement, digital upgrades and expansion, keeping the system safe, stable and maintainable throughout the asset life. Automatic tank gauging is documented as a dedicated basis for the following project stages.

