Our approach

Clarity from the first study to the first product transfer.

01

Define

Capacity, products, logistics and local constraints.

02

Engineer

Safe, operable design aligned to applicable codes.

03

Procure

Qualified equipment, transparent packages and expediting.

04

Deliver

Construction, commissioning, training and handover.

Designed around recognised international codes

API 650 / 620NFPAASMEIECENLocal statutory requirements

Stage-by-stage deliverables

Clear decisions, controlled interfaces and usable project records at every stage.

01

Define

Confirm the business and operating case before fixing the facility scope.

  • Project brief and design basis
  • Capacity and throughput assumptions
  • Receipt and dispatch philosophy
  • Site constraints and information gaps
02

Engineer

Translate the operating case into coordinated, safe and buildable technical packages.

  • Plot plan and process definition
  • Equipment and system specifications
  • Safety and code compliance basis
  • Construction-ready documentation
03

Procure

Control manufacturers and equipment packages against approved technical requirements.

  • Technical bid evaluation
  • Vendor document review
  • Inspection and test coordination
  • Expediting, packing and shipping records
04

Deliver

Bring civil works, equipment, systems and people together for safe startup and operation.

  • Installation and site coordination
  • Testing and pre-commissioning
  • Startup and operator training
  • As-built and handover documentation

Quality and technical assurance

Reviews are tied to project risk and procurement decisions.

Layouts, process assumptions, major equipment data, safety systems and vendor documents are reviewed at defined points before work advances. Inspection and test requirements are set according to the equipment package and applicable project standards.

International delivery coordination

Engineering, China supply and field execution remain connected.

Technical clarification, manufacturer documentation, export packing, shipment sequencing, installation priorities and commissioning needs are coordinated so that equipment arrives with the information required for construction and operation.

Define the next project stage

Tell us where your project stands today.

Whether the project is at concept, feasibility, basic engineering, procurement or construction stage, share the available information and the decisions you need to make next.