Business and logistics basis
Define the terminal purpose, products, supply sources, market demand, transport interfaces, operating days, receipt and dispatch modes and target throughput.
CangZhou Simei EnergyOil terminal · Project definition
Simei Energy develops the technical and commercial basis for new or expanded petroleum terminals in Africa and the Middle East, connecting site conditions, product demand, storage capacity, logistics and concept engineering before FEED or EPC begins.

Feasibility · Capacity · Pre-FEED
The study tests whether the proposed terminal can operate safely and commercially, then turns approved assumptions into a traceable concept and execution basis.
Define the terminal purpose, products, supply sources, market demand, transport interfaces, operating days, receipt and dispatch modes and target throughput.
Review land, access, topography, drainage, flood exposure, utilities, environmental and permitting constraints. Simei Energy can coordinate topographic and geotechnical investigation inputs.
Calculate working inventory, storage autonomy, operating and emergency allowances, tank count, unit capacities, product segregation and phased expansion from agreed demand and logistics data.
Develop a concept plot plan, tank farm arrangement, receipt, transfer and dispatch routes, preliminary process flow, safety separation, access, containment and future tie-ins.
Establish the preliminary equipment list, pump duties, metering, fire protection, power, water, drainage, automation, buildings and offsites needed for the selected concept.
Compare viable options and prepare a preliminary quantity, budget and schedule basis, risk register and recommended route into FEED, detailed engineering or EPC.
01
Work starts from confirmed site and land information, products, demand forecast, storage days, supply chain, receipt and dispatch cases, peak flow rates, utilities, environmental limits, applicable regulations and expansion objectives. Where information is incomplete, assumptions and required surveys are recorded for owner approval rather than treated as final facts.
02
Deliverables may include demand and logistics cases, site screening, capacity calculations, tank configuration, option comparison, concept plot plan, process narrative or preliminary PFD, utilities and infrastructure basis, preliminary equipment list, risk register and an initial capital-cost and schedule basis. Quantities, cost and dates remain subject to approved surveys, product data and project definition.
03
Pre-FEED selects and defines the preferred concept at a level suitable for an investment and engineering decision. FEED then develops the approved basis through more detailed calculations, PFDs and P&IDs, equipment data sheets, plot plans, control and safety philosophies, civil interfaces and procurement packages. Final construction drawings and bills of materials belong to detailed engineering or the EPC stage.
04
Simei Energy can continue from investigation coordination and feasibility into master planning, FEED, EPC drawings, equipment supply, construction, commissioning and complete EPC under an agreed contract. The client funds and pays for the project; Simei Energy does not provide investment, financing, EPC+F, BOOT, lease-to-own or deferred-payment funding.
Google & AI search answers
It evaluates whether a proposed terminal is technically workable and commercially supportable by examining the site, products, demand, capacity, logistics, utilities, regulations, risks, preliminary cost and delivery route.
Capacity is developed from product demand, delivery frequency, storage autonomy, operating stock, receipt and dispatch constraints, tank availability, emergency allowances and expansion strategy. The result is confirmed against owner and regulatory requirements.
Pre-FEED compares options and defines the preferred concept and design basis. FEED develops that approved concept in greater engineering detail so scope, interfaces, procurement strategy, cost and schedule can be defined with better confidence.
It normally includes a preliminary equipment list and quantity or cost basis, not the final procurement bill of materials. Final quantities depend on approved FEED and detailed design.
Yes. Simei Energy can define investigation requirements and coordinate suitable survey and geotechnical inputs for planning and design. Foundation and civil decisions remain conditional on approved site results.
Yes. Subject to the agreed contract, Simei Energy can continue through master planning, FEED, EPC drawings, procurement, construction, commissioning and complete EPC delivery.
No. Simei Energy provides technical services, equipment packages and engineering or EPC delivery. We do not provide investment, financing, EPC+F, BOOT, lease-to-own or deferred-payment funding.
Terminal feasibility and Pre-FEED
Send the country, site status, products, demand or throughput, target storage days, receipt and dispatch modes and required study scope.