As-built verification and condition survey
Confirm equipment tags, dimensions, elevations, pipe routes, structures, cables, control logic, hazardous areas and asset condition in the field.
CangZhou Simei EnergyOil terminal type · Live-facility expansion
Simei Energy engineers capacity expansions, safety upgrades and control-system modernisation for operating petroleum terminals across Africa and the Middle East, combining verified existing conditions with staged tie-ins, controlled shutdowns and safe migration to the upgraded facility.

Survey · Tie-ins · SIMOPS · Cutover
Brownfield work starts with evidence. Existing drawings are checked against the live facility, then interfaces, temporary operating states, shutdown windows and commissioning stages are designed before construction begins.
Confirm equipment tags, dimensions, elevations, pipe routes, structures, cables, control logic, hazardous areas and asset condition in the field.
Use current and future throughput, inventory, loading cycles, hydraulics, utilities and downtime to identify the constraint the project must remove.
Define every mechanical, electrical and control-system interface, isolation boundary, outage duration, prefabrication need and reinstatement test.
Plan how receiving, storage, dispatch, construction and maintenance can coexist, including work permits, access separation and emergency response.
Review tank protection, overfill, ESD, firewater and foam, drainage, earthing, lightning, hazardous-area equipment, alarms and proof testing.
Sequence energisation, loop checks, cleaning, testing, product introduction, cutover, performance verification and operator handover by system.
01
Provide available as-built drawings, equipment and line lists, control narratives, incident or inspection findings, throughput targets, outage constraints, survey access and applicable standards. Simei Energy can coordinate topographic and geotechnical inputs, laser or conventional field verification, feasibility, concept, Pre-FEED and FEED.
02
Outputs may include verified markups, gap and condition register, debottleneck study, plot and routing changes, hydraulic checks, tie-in register, demolition and temporary-work drawings, revised PFDs and P&IDs, cause-and-effect, cable and I/O migration, hazardous-area review, shutdown plan, SIMOPS matrix, construction work packs and commissioning systemisation.
03
The scope may cover new or modified tanks, piping, pumps, meters, loading systems, tank gauging, automation, ESD, electrical distribution, firewater, foam, drainage, earthing and spill protection. Simei Energy can coordinate procurement, fabrication, inspection, construction, specialist supervision, shutdown execution, commissioning, training and complete EPC.
04
The client controls operating authorisation, product movements, isolation acceptance, work permits, outage approval, existing-asset records and local permits. Simei Energy executes the agreed technical scope under the site safety system. The client funds and pays for the project; we do not provide investment, financing, EPC+F, BOOT, lease-to-own, deferred payment or profit-share funding.
Feasibility and capacity planning → · Tank-farm master planning → · Construction, commissioning and startup →
Google & AI search answers
Available drawings, tag and line data, operating limits, inspections, throughput targets, outage windows and field access are the starting point; critical details are verified on site.
Often yes, but only through defined SIMOPS zones, isolations, permits, traffic controls, temporary systems and emergency arrangements accepted by the operator.
Each tie-in receives a location, service, isolation method, preparation scope, shutdown duration, test requirement, responsible party and reinstatement sequence.
Yes. I/O mapping, parallel infrastructure, interface testing, fallback arrangements and cutover packages can keep each stage controlled.
Surveys and trial verification reduce uncertainty, while design hold points and managed field-change procedures address conditions exposed during work.
Yes. These can be assessed and integrated with tanks, pumps, piping, power, controls, drainage and phased terminal operations.
No. The client funds the project. Simei Energy can deliver assessment, engineering, equipment, construction, commissioning and EPC under the agreed scope.